FRAMATOME – Rugles site (Fours)
Jacobsen Ingénierie a réalisé des études en assistance technique pour l’optimisation de la captation des fumées de fours.
Point zéro ventilation, captation fumées de fours
1071
portfolio_page-template-default,single,single-portfolio_page,postid-1071,bridge-core-3.1.7,,vertical_menu_enabled,qode-title-hidden,qode_grid_1300,side_area_uncovered_from_content,qode-child-theme-ver-1.0.0,qode-theme-ver-30.4.2,qode-theme-bridge,disabled_footer_bottom,qode_header_in_grid,qode-wpml-enabled,qode-portfolio-single-template-1,wpb-js-composer js-comp-ver-7.6,vc_responsive
Category
Nuclear industry

Technical assistance to optimize fume capture from barium salt bath furnaces

Client:

FRAMATOME is a subsidiary of the EDF group designing nuclear power plants and supplying nuclear boiler equipment as well as reactor maintenance services.

Client needs:

Jacobsen Engineering carried out technical assistance studies in order to optimize the fume capture from barium salt bath furnaces.

Achievements:

Initial ventilation inspection
Design optimization of ventilation sensors
Sized, supplied and installed temporary ventilation networks
Test campaign, aeraulic network balancing and reports
Impact studies on existing installations
Drafted the required specifications for the permanent ventilation installation

Benchmarks:

Project owner: FRAMATOME
Project management: _

Completion date: 02 to 06/2020